---
title: "Infrastructure Project Feasibility Assessment (Road, Bridge, Water)"
url: "https://legal.ge/en/service/valuation-advisory-services-en/infrastructure-project-feasibility-assessment-road-bridge-water-en"
field: "Valuation & Advisory Services"
description: "Professional technical and economic feasibility studies for infrastructure projects in Georgia. Find verified valuation and advisory experts on Legal.ge."
reviewed: "2026-07-09"
updated: "2026-10-14"
publisher: "legal.ge"
---

# Infrastructure Project Feasibility Assessment (Road, Bridge, Water)

> Source: legal.ge, https://legal.ge/en/service/valuation-advisory-services-en/infrastructure-project-feasibility-assessment-road-bridge-water-en

## Infrastructure Project Feasibility Assessment (Road, Bridge, Water): A Comprehensive Guide

The development of infrastructure projects, such as highways, bridges, tunnels, water supply, and sewerage (wastewater) systems, is the foundation of the socio-economic advancement of any country, including Georgia. Such large-scale initiatives require enormous capital investments and are associated with significant engineering, financial, and environmental risks. That is why it is critically important to conduct a Technical and Economic Feasibility Assessment (Feasibility Study - FS) before the start of a project. This is a complex, multidisciplinary study aimed at determining the viability, technical feasibility, and economic justification of the project. In Georgia, where the construction of the East-West Highway, the modernization of regional infrastructure, and the rehabilitation of municipal water supply networks are actively underway with the support of international financial institutions (EBRD, ADB, World Bank), a high-quality feasibility study is a mandatory prerequisite for securing funding and efficiently managing public or private resources.

## Service Scope and Components

### What This Service Covers

An infrastructure project feasibility assessment combines engineering, economic, legal, and environmental expertise. The service covers the following core and critically important directions:

-   **Engineering and Technical Study:** Analysis of topographical, geological, geotechnical, and hydrological surveys. For roads and bridges, this involves traffic flow forecasting; for water supply, it involves calculating discharge rates, pressure, and water consumption volumes. Comparison of technical alternatives and selection of the best engineering solution.
-   **Financial Modeling and Analysis:** Detailed assessment of the project's capital (CAPEX) and operational (OPEX) expenditures. Calculation of funding sources, Weighted Average Cost of Capital (WACC), Internal Rate of Return (IRR), and Net Present Value (NPV). Assessment of the project's commercial profitability (e.g., in the case of toll roads or concessions).
-   **Socio-Economic Cost-Benefit Analysis (CBA):** Since infrastructure is often a public good, indirect benefits are evaluated. For example: monetizing travel time savings, the economic effect of reducing road accidents, or healthcare cost savings due to access to clean water.
-   **Environmental and Social Impact Assessment (EIA/SIA):** Studying the project's impact on the natural environment, biodiversity, emissions, and noise levels. Also, assessing the need for a Resettlement Action Plan and analyzing social risks.
-   **Risk Analysis and Mitigation Strategy:** Identifying construction, operational, financial, political, and force majeure risks. Sensitivity analysis to determine how cost increases or demand reductions will affect the project's viability.

The full text is available on legal.ge after signing in: https://legal.ge/en/service/valuation-advisory-services-en/infrastructure-project-feasibility-assessment-road-bridge-water-en

### Is a feasibility study required for donor-funded projects in Georgia?

Yes. International financial institutions like the EBRD, ADB, and World Bank strictly require comprehensive feasibility studies, including Environmental and Social Impact Assessments (ESIA), before approving any funding for infrastructure projects.

### What does a Cost-Benefit Analysis (CBA) include for a road project?

A CBA for a road project evaluates not just direct financial costs, but also socio-economic benefits such as travel time savings, reduced vehicle operating costs, and improvements in road safety (fewer accidents).

### How long does the assessment process take?

The timeline varies based on project complexity. A study for a municipal water system might take 2-3 months, while a feasibility study for a major national highway or PPP toll road can take 6 to 12 months to complete.

### Can this report be used for Public-Private Partnership (PPP) proposals?

Absolutely. Under Georgia's PPP Law, a detailed technical and economic feasibility study is a mandatory requirement for proposing, evaluating, and securing state approval for any PPP infrastructure project.
