Architectural Disputes — the Legal Nature of the Relationship
Disputes with an architect usually take two forms: the design is not of adequate quality, or the work built according to the design is not fit. Under Georgian law such relationships sit between two frames: where the architect delivers a result as work, the relationship runs under the rules of the works contract; where the architect only performs acts in the name and at the expense of the client, it falls under the mandate.
Article 629 defines the works contract: the contractor undertakes to perform the work provided for in the contract, and the customer must pay the agreed remuneration; where the works include the manufacture of a product from the contractor’s own materials, the contractor transfers ownership of the product to the customer. The mandate, under Article 709, means that the mandatary must perform the acts entrusted to it by the mandator in the latter’s name and at its expense. The right litigation strategy begins by distinguishing these frames.
The Quality Standard — What Makes a Defect-Free Work
Article 641 sets the standard: a product is free of defects where it corresponds to the agreed conditions; where no conditions are agreed, the product is deemed free of defects if it is fit for the use provided for in the contract or for ordinary use. Manufacturing a product different from what was ordered, or of a lesser quantity, is equated with a defect.
In architectural disputes this standard unfolds into two questions: does the design correspond to the brief and the agreed parameters, and — where the brief was not detailed — is the resulting object fit for its ordinary use. This is why the detail of the technical brief is decisive: the more precise the brief, the smaller the space for interpretation.
Additional Performance — Cure or Remake
On discovering a defect the customer may demand additional performance: under Article 642, the contractor may, at its choice, either remedy the defect or manufacture a new product. For the purpose of additional performance the contractor must bear the necessary costs, including transport, work and materials, but may refuse where additional performance requires disproportionate expenditure. Where it manufactures a new product, it may demand the return of the defective one.
Where the contractor neither refuses nor performs within the period set for additional performance, Article 643 allows the customer to remedy the defect itself and claim reimbursement of the expenses incurred. In architectural practice this means correcting the design through another specialist is possible, with the cost borne by the original performer — provided the conditions are met.